A Benson company - serving Fort Worth, TX
A new modern detached ADU in a backyard
ADU Builders · Burleson, TX

ADU Builders in Burleson - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

14+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee
Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Fort Worth
A small deck outside a new ADU
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
A second-story addition with a balcony, matched to the original house
A single-story rear room addition with tall windows and a new patio
A new sunroom addition with three walls of windows
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable ADU Builders Across Burleson

Building an accessory dwelling unit in Burleson usually costs between $180,000 and $350,000 for a detached unit, with prefab installations running $150,000 to $250,000 and custom site-built ADUs starting around $250,000 and climbing from there. Those are real numbers from projects we’ve scoped across Johnson County, where septic capacity, driveway access, and county setbacks often add $15,000 to $40,000 that city-lot builders never mention. If you’re on acreage off Alsbury Boulevard or down a gravel drive near County Road 604, the planning conversation is different than a suburban infill lot in the newer subdivisions off John Jones Drive. That’s exactly what we do every day. Call (682) 204-9686 and we’ll put a written price in front of you before any dirt moves.

Call (682) 204-9686

Why Benson ADU Fort Worth Is Burleson’s Preferred ADU Builders Company

The bathroom inside a new ADU

We’re part of the Relay Home Co. family, founded in 2006, and our ADU Builders team has spent years working lots in Burleson that don’t fit the standard suburban playbook. The ones with septic systems at capacity, long unpaved drives, and Johnson County permitting on top of city requirements. Homeowners here tend to ask the same three questions: will the county sign off, will the drainfield handle another bedroom, and can your equipment even reach the build site without destroying my yard. We answer all three in writing before you commit.

Troy Eastman leads our crew, and every technician who steps onto your Burleson property is background-checked and in uniform. You know exactly who’s walking onto your land. We also build with brands you can research yourself: Mighty Buildings, Plant Prefab, and Boxabl for ADUs, plus James Hardie cladding. No mystery materials, no verbal estimate that shifts on demo day. You get a written price, live arrival times, before-and-after photos, and a digital invoice you can pay by link. And our 365-Day Done Right Promise means if the work isn’t right within a full year, we make it right. In writing. On every project.

ADU Contractor in Burleson

Hiring an ADU Contractor in Burleson means finding someone who understands that most of the county’s older lots were platted for one house and one septic system, not two households under one roof. We scope every project starting with what’s underground: septic tank location, drainfield capacity, well setbacks, and whether city sewer is even available on your stretch of road. That’s the part of the job that separates a clean build from a six-month permitting headache.

Septic and Utility Reality on Burleson Acreage

Many homes in older, unincorporated parts of Burleson run on septic, not city sewer. Adding a detached ADU with a bathroom and kitchen often pushes the existing system past its rated capacity, which triggers a mandatory engineered field expansion or a connection to city sewer if the line runs near your property. Budget $10,000 to $30,000 for septic upgrades and another $8,000 to $20,000 if you need a sewer line extension. We coordinate the county sign-off and the drainfield work before we quote, so the number you see is the number you pay.

Access, Grading, and Equipment

Long gravel driveways and open lots create staging problems most suburban contractors never face. We schedule material deliveries around your property’s access constraints and use tracked equipment where a wheeled skid steer would chew up your lawn. Drainage matters too: Burleson heavy rain events can wash out a fresh foundation if the site runoff isn’t managed before the first storm hits. We grade and slope the pad as part of the base scope, not as a change order later.

ADU Design in Burleson

The bedroom inside a new ADU

ADU Design in Burleson starts with Johnson County setback rules, not Pinterest boards. On a large lot, you may have plenty of room, but the drainfield, well, property lines, and easements each pull the building envelope in different directions. We map the constraints first, then design the ADU to fit the land you actually have, whether that’s a detached two-bedroom unit or a Junior ADU attached to the main house.

Designing Around Septic and Well Lines

We built a detached ADU for a family on a 1.5-acre lot off County Road 604 in unincorporated Burleson. Their existing septic system was at capacity, so we coordinated an engineered field expansion and set the ADU 10 feet from the new drainfield to meet Johnson County setbacks. Long gravel drive access meant our crew scheduled all material deliveries for off-peak hours and used a tracked skid steer to set the prefab panels without tearing up the yard. That kind of sequencing is design work, not just logistics.

Storm-Ready Envelope and Foundation

Burleson summers punish under-insulated ADUs, and spring storm season punishes roofs and drainage. We spec HVAC systems sized for the square footage plus the humidity load, use storm-rated roofing fastening, and detail foundation drainage so heavy rain doesn’t find its way under your floor. A properly designed ADU here costs a little more up front and avoids major repairs within the first two years.

Trusted Brands We Service in Burleson

We’re authorized to build with Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, Tuff Shed, and James Hardie cladding, which means you get curated options instead of whatever the contractor happens to stock. On Burleson projects, we lean toward Plant Prefab and Boxabl for quicker assembly on open lots, and Mighty Buildings when the site requires panelized construction we can stage on a tight access driveway. Every brand we recommend is one you can look up online and verify independently before you sign anything. That’s the point.

Common ADU Builders Problems We See in Burleson Homes

  • Septic capacity surprises: Many Burleson homes built in the 1970s-2000s on large lots still operate on septic systems sized for the original house. Adding an ADU pushes those systems over the permitted capacity, and the county will not issue a building permit until you address it. We test the system as part of our free estimate.
  • Unpaved or narrow driveway access: Long gravel drives are common south of Burleson along County Road 604 and other rural routes. Heavy delivery trucks and equipment can tear up soft ground, so we stage materials with smaller trucks and tracked machinery to protect your property.
  • Grading and drainage failures: Burleson’s heavy rain events expose poor site drainage fast. If the ADU pad is not properly graded and sloped, runoff can wash out the foundation or flood the unit within the first storm season. We include drainage and grading in the base scope, not as an add-on.
  • County vs. city permitting gaps: Homes in unincorporated Johnson County answer to county permitting, not Burleson’s city code. Different setback rules, different septic requirements, different inspectors. We handle both jurisdictions, so you don’t get caught between them.

Pricing for ADU Builders in Burleson, TX

A detached ADU in Burleson typically runs $180,000 to $350,000 for site-built construction, while prefab units from Plant Prefab, Boxabl, or Mighty Buildings land between $150,000 and $250,000 including installation. Studio ADUs and Junior ADUs on smaller footprints start closer to $120,000. Septic upgrades add $10,000 to $30,000 when required. Sewer line extensions add $8,000 to $20,000 depending on distance to the main. Long driveways and difficult access can add $5,000 to $15,000 in equipment and staging costs. We give every Burleson homeowner a written line-item price before work starts. No verbal estimate, no scope creep. Call (682) 204-9686 for your free, written estimate.

We Also Serve Cities Near Burleson

Our Burleson clients often ask us to recommend builders for family in nearby cities. We serve Crowley, Kennedale, Fort Worth, and Haltom City, and the same written pricing and 365-Day Done Right Promise applies in every market. If you’re on acreage in one of those communities, call us, and we’ll schedule a site walk just like we do in Burleson.

Serving Burleson, TX - Our Local Coverage Area

We’re based in the Burleson area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU Builders in Burleson

Why Burleson Chooses Benson ADU Fort Worth

We set the standard for adu builders in Burleson.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Burleson

Getting your adu builders handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu builders needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Burleson - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu builders pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Burleson Customers Say

Trusted by homeowners across Burleson and surrounding areas.

★★★★★

"Plumbing and electrical passed on the first inspection."

Alan B. · Verified customer
★★★★★

"Garage conversion into a guest suite. I could see the permit status in the app, which made it painless."

Rick F. · Verified customer
★★★★★

"Booked a consult online and met the project manager two days later. Weekly progress updates arrived by text with photos. ADU finished on schedule."

Hannah W. · Verified customer

More ADU services in Burleson

Every build below starts the same way: a free site visit and a written price.

Getting started with Benson in Fort Worth

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Fort Worth team

A local crew that works across Fort Worth and the towns around it, to the same written standard as every Benson location.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Builders in Burleson?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Burleson.

(682) 204-9686

Request a Free Estimate in Burleson

Tell us about your adu builders needs - we'll respond within the hour.

By submitting this form, you agree to our Privacy Policy and agree that you may be contacted by phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch